19-20 Jun 2014, Camden – Belsize park, we used Devi mat and we covered lower ground floor area with 2 zones with foil mat under wood floor. The client was very happy and satisfied.
Building work on an existing shower room in a bathroom, all was changed and new natural stone was added + damp proofing (this was the reason we had to redo previous’ builder: protection not applied prior to tiling).
Front, back facade and back small garden was done on time and on very good manners of work. The client was happy and recommend us to the next customer.
A very large house on a high level of quality with all electrical done in just 2.5 months, record time for a house of this size. The client was very happy.